Wednesday, March 21, 2007

Job Well Done

That's Dan changing the power lines from the old mast to the new. The power lines came from the pole on the street (to the right) through some trees. A tree limb placed quite a load on the lines so Dan and Greg added "tree trimming" to their resumes.
Here's a shot of the finished product - the single, new mast with power connected.

And the new panel has been installed and energized.