Tuesday, January 30, 2007
Indication of Progress
Expanding Kitchen
Monday, January 29, 2007
Just Wait Till Spring!
Daylight Basement
A Clean Basement
On a break today from ripping up tile I turned my energies to the "daylight basement". While the house looks to be one story from the front, it is two stories on the back. Here's a shot of one of the three rooms that face the back yard. In each basement room there is space - lots of it - for a shop or 4th bedroom or whatever. We plan to build out some of this space or leave it for the new home owner.
Tuesday, January 16, 2007
Holmes Point
Here is our current project, under contract. It is located in Kirkland, Washington. It is a 3 bed, 1 3/4 bath, 1 story rambler with a "daylight" or walkout basement. The house was built in 1963 and has enjoyed several remodels, most noted is the kitchen area with tall ceilings. The house is located in the Holmes Point neighbor, a quiet area near parks, trails and horse pastures. We are renovating this property with a new roof, electrical service and a fabulous new kitchen. If you are interested in making it your new home, contact Bill at wahoover@comcast.net.
Subscribe to:
Posts (Atom)
Blog Archive
-
▼
2007
(72)
-
▼
January
(11)
- Indication of Progress
- Expanding Kitchen
- Just Wait Till Spring!
- Daylight Basement
- A Clean Basement
- Here's a good view of the curbside of the house. ...
- Here's another shot of the range. It has a set of...
- But before I get too far along demolishing things...
- And so it begins ... this is in the kitchen. Chec...
- Work begins! We closed on Tuesday 1/23/07. Right ...
- Holmes Point
-
▼
January
(11)