Here's the finished product, a level floor ready for hardwood installation. Four layers deep at the back edge and one at the "feathered" edge. Over this will be layed the vapor barrier and then the oak flooring will be nailed - repeatedly.

I used 1/4 inch Luan plywood to "reverse stair step" my way to level. Each layer is secured with galvanized screws.

Here I'm beginning to level the floor. This area dipped 1 1/4" down into the laundry closet and towards the garage door.

Popping Up Baseboards ...
Earlier I removed all the baseboards in the living areas in preparation for hardwood floor refinishing and installation. Tools of the trade include utility knife, putty knife and a flat prybar.